专题:Resource-Constrained Project Scheduling

This cluster of papers focuses on the challenges and techniques for project scheduling under uncertainty and resource constraints. It covers topics such as resource-constrained project scheduling, optimization using metaheuristics, multi-mode scheduling, genetic algorithms, critical chain scheduling, stochastic analysis, time-cost trade-off, and various scheduling heuristics.
最新文献
Time Table -Generator A Automated Time Table

article Full Text OpenAlex

Rethinking Schedule Quality Risk Assessment

article Full Text OpenAlex

Decision-Making Models for High-Risk Projects: Balancing Cost, Quality and Time

article Full Text OpenAlex

Time Impact Analysis (TIA) Window Analysis with a Case Study

article Full Text OpenAlex

Research and Application of Satellite Communication Intelligent Scheduling System Based on Work Order Management

book-chapter Full Text OpenAlex

Balancing Time Commitments in University

book Full Text OpenAlex

D1.3 Project Management Handbook with Templates & Guide (First Update)

article Full Text OpenAlex

A bi-objective robust fuzzy programming model to configure a microgrid-based cement supply chain

article Full Text OpenAlex

A Predictive Framework for Scheduling Stochastic Processes on Heterogeneous Resources

book-chapter Full Text OpenAlex

282Chapter 9 Optimizing Organizational Systems via Differential Transformation

book-chapter Full Text OpenAlex

近5年高被引文献
An updated survey of variants and extensions of the resource-constrained project scheduling problem

article Full Text OpenAlex 233 FWCI28.14810589

A Manifesto for project management research

article Full Text OpenAlex 103 FWCI33.31937144

Risk Propagation in Multilayer Heterogeneous Network of Coupled System of Large Engineering Project

article Full Text OpenAlex 98 FWCI19.64801562

RETRACTED: Optical microscope algorithm: A new metaheuristic inspired by microscope magnification for solving engineering optimization problems

article Full Text OpenAlex 80 FWCI20.43543101

Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction

article Full Text OpenAlex 72 FWCI9.61581257

Production scheduling of off-site prefabricated construction components considering sequence dependent due dates

article Full Text OpenAlex 70 FWCI8.2765699

Resource-constrained multi-project scheduling problem: A survey

article Full Text OpenAlex 69 FWCI13.83380692

A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem

article Full Text OpenAlex 66 FWCI9.79064553

Multi-objective optimal scheduling of automated construction equipment using non-dominated sorting genetic algorithm (NSGA-III)

article Full Text OpenAlex 62 FWCI8.11778438

Development of time–cost trade-off optimization model for construction projects with MOPSO technique

article Full Text OpenAlex 60 FWCI57.39136174