专题:Resource-Constrained Project Scheduling

This cluster of papers focuses on the challenges and techniques for project scheduling under uncertainty and resource constraints. It covers topics such as resource-constrained project scheduling, optimization using metaheuristics, multi-mode scheduling, genetic algorithms, critical chain scheduling, stochastic analysis, time-cost trade-off, and various scheduling heuristics.
最新文献
Code and Data Repository for Wasserstein Risk-Sensitive Appointment Scheduling under Delay Constraints

article Full Text OpenAlex

Calculation of Buffer Zone Size for Critical Chain of Hydraulic Engineering Considering the Correlation of Construction Period Risk

article Full Text OpenAlex

Task-Based Risk Scoring for Early Prediction of Cost and Time Overruns in Construction Projects

article Full Text OpenAlex

Questionnaire for Assessing for Causes of Delay in Residential Investment Projects (Using Fuzzy AHP Technique)

article Full Text OpenAlex

Scheduling Intrees with Unavailability Constraints on Two Parallel Machines

article Full Text OpenAlex

Study on stability and failure modes of long-narrow deep excavations

article Full Text OpenAlex

A Reinforcement Learning Guided Oppositional Mountain Gazelle Optimizer for Time–Cost–Risk Trade-Off Optimization Problems

article Full Text OpenAlex

Analysis of Material Inventory Control Management for Structural Works using Economic Order Quantity, Reorder Point, and Safety Stock Methods in a 2.5-Storey Boarding House Construction Project

article Full Text OpenAlex

An innovative two-stage method for balancing time, cost, quality, and additional objectives in multi-mode resource-constrained project scheduling: A case study of a food product packaging production line project

article Full Text OpenAlex

Research on Intelligent Quality Control of Nuclear Power Construction under Value Chain Collaborative Enabling

article Full Text OpenAlex

近5年高被引文献
Project Management Handbook

book Full Text OpenAlex 157 FWCI5.7451

A Manifesto for project management research

article Full Text OpenAlex 118 FWCI30.2894

Risk Propagation in Multilayer Heterogeneous Network of Coupled System of Large Engineering Project

article Full Text OpenAlex 104 FWCI16.7527

RETRACTED: Optical microscope algorithm: A new metaheuristic inspired by microscope magnification for solving engineering optimization problems

article Full Text OpenAlex 85 FWCI15.015

Resource-constrained multi-project scheduling problem: A survey

article Full Text OpenAlex 79 FWCI12.1806

Development of time–cost trade-off optimization model for construction projects with MOPSO technique

article Full Text OpenAlex 70 FWCI35.327

An expert system for highway construction: Multi-objective optimization using enhanced particle swarm for optimal equipment management

article Full Text OpenAlex 69 FWCI18.9311

Extensions of the resource-constrained project scheduling problem

article Full Text OpenAlex 66 FWCI16.8946

Multi-objective optimal scheduling of automated construction equipment using non-dominated sorting genetic algorithm (NSGA-III)

article Full Text OpenAlex 65 FWCI6.7812

Construction time–cost–resources–quality trade-off optimization using NSGA-III

article Full Text OpenAlex 60 FWCI15.3333