专题:Resource-Constrained Project Scheduling

This cluster of papers focuses on the challenges and techniques for project scheduling under uncertainty and resource constraints. It covers topics such as resource-constrained project scheduling, optimization using metaheuristics, multi-mode scheduling, genetic algorithms, critical chain scheduling, stochastic analysis, time-cost trade-off, and various scheduling heuristics.
最新文献
Digital-Twin-Based Lifecycle Intelligent Construction for Prefabricated Buildings: A Data-Driven Project Management Framework and Empirical Validation

article Full Text OpenAlex

Multi-Source M/G/1/1 Queues with Probabilistic Preemption

article Full Text OpenAlex

An effective iterated greedy heuristic for the flow shop scheduling with heterogeneous workers

article Full Text OpenAlex

Production Planning with an Enriched BIM-Based Heuristic Construction Order Model to Improve the Efficiency of Complex Prefabricated Projects

article Full Text OpenAlex

A framework for decision making under deep uncertainty in hard-to-abate industries: An application case for investment in a German steel plant

article Full Text OpenAlex

Due-Window Assignment Scheduling Problems with Position-Dependent Weights, Truncated Learning Effects and Past-Sequence-Dependent Setup-Times

article Full Text OpenAlex

Planning multilayer networks under deep uncertainties: an approach based on flexibility in engineering design

article Full Text OpenAlex

Study on Controllable Processing Time and Minmax Group Scheduling with Common Due-Window Assignment

article Full Text OpenAlex

Research on online EDI order scheduling optimization strategy in manufacturing enterprises based on time-varying Markov chains

article Full Text OpenAlex

Code and Data Repository for Wasserstein Risk-Sensitive Appointment Scheduling under Delay Constraints

article Full Text OpenAlex

近5年高被引文献
Project Management Handbook

book Full Text OpenAlex 157 FWCI5.7451

A Manifesto for project management research

article Full Text OpenAlex 122 FWCI29.7746

Risk Propagation in Multilayer Heterogeneous Network of Coupled System of Large Engineering Project

article Full Text OpenAlex 104 FWCI16.7833

RETRACTED: Optical microscope algorithm: A new metaheuristic inspired by microscope magnification for solving engineering optimization problems

article Full Text OpenAlex 85 FWCI14.4847

Resource-constrained multi-project scheduling problem: A survey

article Full Text OpenAlex 83 FWCI12.1631

Development of time–cost trade-off optimization model for construction projects with MOPSO technique

article Full Text OpenAlex 76 FWCI35.0351

Multi-objective optimal scheduling of automated construction equipment using non-dominated sorting genetic algorithm (NSGA-III)

article Full Text OpenAlex 72 FWCI6.8039

Extensions of the resource-constrained project scheduling problem

article Full Text OpenAlex 71 FWCI17.4204

An expert system for highway construction: Multi-objective optimization using enhanced particle swarm for optimal equipment management

article Full Text OpenAlex 70 FWCI17.7605

Construction time–cost–resources–quality trade-off optimization using NSGA-III

article Full Text OpenAlex 64 FWCI15.8823